The Rail Park: What's Open, What's Planned and the Blocks Around It
Back
By Max Karasick, Compass real estate agent licensed in PA and NJ
The Rail Park is a quarter mile of planted path on an old railroad viaduct, running from Broad and Noble Streets to Callowhill Street between 11th and 12th. As of November 2026 it's free and open daily from 7 a.m. to 10 p.m. That's Phase 1, which opened June 14, 2018. Next in line is the Viaduct Greenway, about six tenths of a mile from Vine Street to Fairmount Avenue, where the Center City District says construction documents are slated for early 2027. No construction start or opening date has been announced.
What's Open on the Rail Park Right Now?
Phase 1 runs about 1,320 feet, per the Center City District's 2026 fact sheet, along the SEPTA-owned spur of the viaduct on steel bridges from the 1890s that were repaired and repainted rather than replaced. Up top are about 1,100 plants, wooden platforms and big porch-style swinging benches. An 80-foot laser-cut steel Story Wall lays out the Callowhill neighborhood's industrial history.
There are two ways in. The Noble Street entrance, just east of Broad, is the wheelchair accessible one, and the path rises at an ADA-compliant slope from there. The Callowhill Street entrance between 11th and 12th is a staircase. Friends of the Rail Park says pets are welcome if you clean up and keep them out of the planting beds. The group also runs Saturday Three Mile Vision walking tours, and those ask you to leave pets other than service animals at home. There are no restrooms, so plan the coffee stop.
Philadelphia Parks and Recreation maintains the park, Friends of the Rail Park runs programming and tours and the Center City District raised the money and managed construction. CCD puts the Phase 1 cost at $10.3 million. The B's Broad-Spring Garden station, still Spring Garden on older signs, is just up Broad at 500 N. Broad Street, and Indego's station feed lists a dock at 12th and Callowhill.
What's Planned Next: The Viaduct Greenway
The Center City District calls Phase 2 the Viaduct Greenway: 6.8 acres of brownfields running six tenths of a mile from Vine Street to Fairmount Avenue, turned into an elevated park. Under a development agreement with the City, CCD hired the Phase 1 design team, Urban Engineers and Studio Bryan Hanes. CCD says construction documents are slated for completion in early 2027. It doesn't give a construction start.
Money is arriving in pieces. CCD lists a federal Reconnecting Communities grant, state grants and several foundations, and says it will raise all the funds to finish. On May 28, 2026, Congressman Brendan Boyle announced $2 million in federal funding for phase two, on top of $2 million he'd secured earlier. No total budget has been published.
Ownership is the open question. CCD says it worked with the City on a case before the federal Surface Transportation Board, which confirmed the viaduct is no longer an operating rail line. Per CCD, that strips Reading International of its exemption from city codes, taxes and eminent domain, clearing the way for a park. As of November 2026, the City hasn't announced a completed purchase of the Phase 2 stretch. Until a construction date is posted, any opening year you hear is a guess.
The Cut, the Tunnel and the Three Mile Vision
The big picture, per Friends of the Rail Park, is a three mile greenway across 10 or more neighborhoods, from Northern Liberties to Brewerytown, in three sections. The Viaduct is the elevated line running from the open Phase 1 stretch down to Vine Street, then arcing north and east toward Fairmount Avenue. The Cut runs below street level from North Broad Street, near the old Inquirer Building, to behind the Rodin Museum where 22nd Street meets Pennsylvania Avenue, between 30-foot stone walls crossed by street bridges. The Tunnel runs 3,000 feet under Pennsylvania Avenue between 22nd and 27th Streets, with vaulted brick ceilings 25 feet high.
A feasibility study finished in 2023 set that vision, and Friends of the Rail Park says it's advancing plans for the Cut as its next phase. In April 2025 the Knight Foundation gave it $500,000 for a Community First Plan to shape future phases. Neither the Cut nor the Tunnel has a published design, budget or schedule this fall.
The Blocks Around the Park
The City's permit records on Atlas show new construction around Phase 1. A few from the last few years:
326 N. 12th Street: a six story building with 31 dwelling units over a ground floor parking garage and a shared roof deck. Its building permit is marked completed.
1303-09 Buttonwood Street: a September 30, 2026 zoning permit for additions to an existing four story building, for 43 dwelling units and 15 bike parking spaces. The permit is in amendment review.
225 N. 13th Street: a seven story modular building with 81 visitor accommodation units, the zoning category that covers hotels, with a ground floor space zoned for a sit-down restaurant in January 2026.
1103, 1105 and 1107 Clay Street and 610 N. 11th Street: four new attached single family homes, permitted in September 2025.
A permit says what's allowed, not when it opens.
What This Means for Owning or Renting Nearby
Around the park you'll find older industrial buildings, newer apartments like the ones above and a few new attached homes north toward Spring Garden Street. The viaduct itself is a contributing structure in the Callowhill National Industrial Historic District.
The park's Noble Street entrance carries a 19123 ZIP code. As of October 2026, Zillow's Home Value Index put the typical home in ZIP code 19123 at about $464,000, and Zillow's Observed Rent Index put typical rent there at about $2,089 a month. Realtor.com counted 144 active listings in 19123 that month at a median list price of $562,500. Those cover the whole ZIP, well past the viaduct.
Nobody can tell you what Phase 2 will do to prices, and Max won't pretend to. For a home near the viaduct, he checks which side of the structure it faces, what the City has permitted on the parcels around it and the walk to the Noble Street ramp. For new construction, he confirms whether a tax abatement applies and when it ends. For a longer walk, the Schuylkill River Trail guide covers the other side of town. See the Center City area guide and all area guides, and Max's process on the buy page and the rent page.
Maximize Your Weekends.
Official Sources
Friends of the Rail Park: News and Events (Knight Foundation grant, April 15, 2025)
Center City District: The Rail Park, Phase 2, The Viaduct Greenway
Congressman Brendan Boyle: $2 Million for Rail Park Phase Two (May 28, 2026)
Zillow Research: ZHVI and ZORI, ZIP code 19123 (October 2026)
Realtor.com Economic Research: ZIP code 19123 inventory (October 2026)
FAQ
Is the Rail Park open?
Yes. Phase 1 of the Rail Park is free and open daily from 7 a.m. to 10 p.m. as of November 2026. The wheelchair accessible entrance is on Noble Street just east of Broad Street, and a staircase entrance sits on Callowhill Street between 11th and 12th Streets. The park has no restrooms.
How long is the Rail Park?
The open part of the Rail Park, Phase 1, is about a quarter mile, roughly 1,320 feet, according to the Center City District. The planned Viaduct Greenway would add about six tenths of a mile from Vine Street to Fairmount Avenue, and the full vision from Friends of the Rail Park covers three miles.
When will the next phase of the Rail Park open?
No opening date has been announced for the Rail Park's next phase as of November 2026. The Center City District says construction documents for Phase 2, the Viaduct Greenway, are slated for completion in early 2027, and it has not published a construction start. Friends of the Rail Park is separately advancing plans for the Cut.
Are dogs allowed on the Rail Park?
Dogs and other pets are welcome on the open part of the Rail Park, according to Friends of the Rail Park, as long as owners clean up after them and keep them out of the planting beds. Pets other than service animals are not allowed on the group's guided tours.